Missileers on duty in launch control centers across the Air Force are gaining Internet connectivity, increasing down-time productivity, thanks to Douglas Angell, a technical engineer with the 526th ICBM Systems Group at Minot AFB, N.D. Crewmembers can now “complete their career development courses and other training” during “slack time in the office” rather than waiting to go off duty, Angell explained. He added, “They wanted this system and I was able to design it for them.” Angell’s Launch Control Center NetLink design will cost roughly $250,000, including installation, saving the Air Force more than a million dollars by constructing the network “in house” rather than relying upon a contractor’s design. For his effort, Angell won the maximum $10,000 payout from USAF’s Innovated Development through Employee Awareness, or IDEA, program, that incentivizes cost savings and process improvement. (Minot report by A1C Jessica McConnell)
The Air Force and Boeing agreed to a nearly $2.4 billion contract for a new lot of KC-46 aerial tankers on Nov. 21. The deal, announced by the Pentagon, is for 15 new aircraft in Lot 11 at a cost of $2.389 billion—some $159 million per tail.