The Air Force and Lockheed Martin reconfigured the on-orbit Milstar constellation—altering the relative positions of the five communications satellites to each other to provide better coverage. A Lockheed release says a combined team of company engineers and airmen of the 4th Space Operations Squadron at Schriever AFB, Colo. conducted the reconfiguration over a seven-month period. Lockheed noted that the ability to realign operational satellites—with “no unplanned service disruptions to military forces deployed around the globe”—would be useful in the transition to the Advanced Extremely High Frequency satellites. The first AEHF sat is slated for launch in 2008.
The Air Force and Boeing agreed to a nearly $2.4 billion contract for a new lot of KC-46 aerial tankers on Nov. 21. The deal, announced by the Pentagon, is for 15 new aircraft in Lot 11 at a cost of $2.389 billion—some $159 million per tail.