Lockheed Martin has delivered to Northrop Grumman a pointing and control assembly system for the second geosynchronous orbit satellite in the Space-Based Infrared System constellation, according to a company release. Northrop, which now can begin integrating the PCA into the GEO-2 payload, also is working on assembly of GEO-1. Lockheed expects Northrop to deliver GEO-1 in mid-2007, whereupon Lockheed will perform final assembly and checkout in preparation for launch in late 2008.
The 301st Fighter Wing in Fort Worth, Texas, became the first standalone Reserve unit in the Air Force to get its own F-35s, welcoming the first fighter Nov. 5.